|
A
Flushing Service that will last...
The
Flushing procedure includes the
following elements:
- An
on-site meeting conducted prior
to the flush to go over the
details of the flush including
scheduling man-power, supplies,
etc...
- An
external kidney loop filtering
unit that assures no particulates
are added to the system when
adding fluid to the reservoir
during the flush. This system
considerably shortens the flush
time.
- Experienced
on-site, system engineers to
act as the technical directors
for your supplied labor force
to assure proper procedures
are followed throughout the
flush.
- An
on-site independent fluid analysis
representative who will be taking
fluid samples and analyzing
the fluid throughout the flush.
- A
thorough written report detailing
how the system was found, what
was done, and how the system
was left.
|
30
lbs of sludge was extracted from
a system
|
|
Turbo
Filtration Corporation
P.O. Box 850999
Mobile, Alabama 36685
Office:
(251) 675-8820
Toll Free: 1-866-675-8820
Fax: (251) 675-8847
Specialist
at what we do best - Mike Enger (owner),
alone offers 25 years experience.
TFC Global has a combination of expertise
and experience of more than 50 yrs. We offer
quality Turbine Generator
Lube Oil System
Cleaning Service on Steam Turbines, Nuclear
Turbines, Gas Turbines, Gas Units
Specialized Services
Turbine Lube Oil Flush ||Oil System Hydroblasting || Cooler Cleaning & Retubing ||
EHC System Flushing || Onsite Lab Service || Compressor Flushing || Equipment Sales & Rental Copyright © 2006 Turbo Filtration Corporation. All rights reserved.
Problems with this page? contact support@tfcoilflush.com
|